Home > Products > conveyor belting related Products > Contact Adhesive >

Contact adhesive for conveyor belt splicing

Contact adhesive for conveyor belt splicing

Contact adhesive for conveyor belt splicing
Contact adhesive for conveyor belt splicingContact adhesive for conveyor belt splicingContact adhesive for conveyor belt splicingContact adhesive for conveyor belt splicingContact adhesive for conveyor belt splicing
CategoriesContact Adhesive
AlbumView larger image
BrandFRONT
ModelGermanbelt 2KR
ColorBlack
SpissitudeApprox 1.45 g/cm³
HardenergermanBond® RE
ApplicationBrush ,spatula
Shelf lifeMinimum of 48 months
BasePolychloroprene(CR)
FOB portQingdao Port, China .
Download DOC
Update Time2020-10-31
Detail Information

Contact adhesiveTechnical Specifications :

 

Base

Polychloroprene(CR)

Solvent

trichloreethylene

Colour

black

Spissitude

Approx 1.45 g/cm³

Hardener

germanBond® RE

Diluent/Cleaner

germanBond® CLT

Application

Brush ,spatula

Application quantity

Approx 250 g/m²per coat

Flash-off time

Approx 10 min (at 200)

Pot life

Approx 2 h (at 20)

Shelf life

Minimum of 48 months

Storage requirements

Dry ,cool, in tightly closed buckets

Packing units

germanBond® 2KR 1.0KG tin

germanBond®RE Hardener: 50g (has to be ordered separately)




Contact adhesive advantages :

● Reliable ,strong bonds.             

● High standard of quality .            

● Optimal processing times .           

● Optimized contact bonding           

● Environmental friendly production .    

● To German work standards.          

● Long pot lives .                   

● Easy to use.                     

● Non-inflammable . 


Application :


For permanent-elastic and high-strength contact bonding of rubber to rubber, rubber to fabric, fabric to fabric and rubber to metal as well as leather,polyurethane and other materials .

 

Primarily used for conveyor belt splices , repairs on conveyor belts, pulley linings and wear protection linings of technical rubber in open pit minings, underground mines, steel plants etc.

 

Application instructions :

 

Mixing

Mix thoroughly (2-3 min) at a ratio of ,

Adhesive 2KR: Hardener RE=100:5.

The maximum handling time the mixed product is up to 2 hours in covered and closed buckets.

请按照以下比例进行混合(2-3分钟);

2KR冷粘胶;RE固化剂=100:5

请充分搅拌均匀,混合后的胶料请储存于密闭封盖的容器,并在两小时内使用。

Application

 

Favourable donding conditions are at 15-25℃ and at 30-65% relative humidity of the air .

2-3 coats are necessary on rubber and fabrics

1 coat on materials with CN layer

 

Apply the first coat thin and even to both bonding surfaces using a paint roller or brush and let it dry completely(minimum of 30 min).

Apply the second coat thin and even on both surfaces and let it dry until the surface is slightly tacky(approx 10 min), checking with back of finger nall.(If too dry by false timing ,apply third coat)

Join the bonding surfaces together by applying strong and short contact pressure( i.e. using rollers ,special hammer ,manual or pneumatic with rubber head)

橡胶与织布层建议涂抹2-3层

CN层材料建议涂抹1层

 

请确保粘合表面的清洁。使用圆滚毛刷在两个粘合表面均匀轻薄的涂抹第一层胶料,并等待完全干透(最少30分钟)。

均匀轻薄的涂抹第二层胶料,等待干到尚有略微的粘性,(大约10分钟),可以用指甲轻触,达到轻微黏附指甲的程度。(如果不能正确掌握时间出现过于,请涂抹第三层)

将两个粘合表面粘贴在一起,紧密贴合并压实(建议使用滚轮或者特殊的橡胶头手动或气动锤子)

 


Related Products
    Please send your message to us
    *Email
    *Title
    *Content

    Agree to use terms of service